Global Microturbine - Global Energy LLC


Publication Title | 400-800 VAC Wye connection required affected all Capstone Micro Turbines

Microturbine Search Engine Series

Capstone Turbine Publications search was updated real-time via Filemaker on:

Capstone Turbine Publications | Return to Search List

Search Completed | Title | 400-800 VAC Wye connection required affected all Capstone Micro Turbines
Original File Name Searched: sb0003.pdf | Google It | Yahoo | Bing



Page Number: 001
Previous Page View | Next Page View

Text | 400-800 VAC Wye connection required affected all Capstone Micro Turbines | 001



Capstone

Subject: Affected:

Abstract:

Capstone Customer Service Toll Free 1-(877) 282-8966 www.capstoneturbine.com

Description: Corrective Action:

The description of acceptable electrical connections is attached.

Ensure that all Capstone MicroTurbines have electrical connections that are 3-wire wye or 4-wire wye. Add the attached pages to your Capstone Installation and Start-Up manual.

SB0003

March, 1999

SERVICE BULLETIN

400-480 VAC Wye connection required AllCapstoneMicroTurbines

In grid-parallel mode, your MicroTurbine must be connected to a 400-480 VAC Wye connection. Phase- to-phase voltages and phase-to-neutral voltages must be balanced. Electrical 3φ Delta connections are not acceptable for proper operation.

This information is confidential and proprietary to Capstone. Neither this document nor the information contained herein shall be copied, disclosed to others, or used for any purposes other than the specific purpose for which this document was delivered.

1

Image | 400-800 VAC Wye connection required affected all Capstone Micro Turbines



400-800-vac-wye-connection-required-affected-all-capstone-micro-turbines-
Capstone Turbine For Sale - Microturbine C30 C65 C200 C600 C800 C1000 - Go to microturbine website

Search Engine Contact: greg@globalmicroturbine.com