Global Microturbine - Global Energy LLC


Publication Title | Application Guide Interconnection for Capstone MicroTurbines

Microturbine Search Engine Series

Capstone Turbine Publications search was updated real-time via Filemaker on:

Capstone Turbine Publications | Return to Search List

Search Completed | Title | Application Guide Interconnection for Capstone MicroTurbines
Original File Name Searched: 480001_Interconnection_Application.pdf | Google It | Yahoo | Bing



Page Number: 001
Previous Page View | Next Page View

Text | Application Guide Interconnection for Capstone MicroTurbines | 001



Capstone

Capstone Turbine Corporation • 21211 Nordhoff Street • Chatsworth • CA 91311 • USA Telephone: (818) 734-5300 • Facsimile: (818) 734-5320 • Website: www.microturbine.com

Application Guide Interconnection for Capstone MicroTurbines

This document presents a standardized method for the interconnection of Capstone MicroTurbineTM generators to the power grid.

Introduction

Compliance with the requirements detailed in this document is essential to avoid problems that can affect the performance, life, reliability, warranty, and in some cases, the safe operation of the Capstone MicroTurbine.

The purpose of this Guide is to provide a standardized method for the interconnection of Capstone MicroTurbine generators to the power grid. This guide is intended for use by Capstone distributors, buyers, consulting engineers, and utility companies when considering MicroTurbines for parallel operations. Revisions to this guide will be made as significant technical developments occur which affect the interconnect process or as regulatory changes occur.

Due to technical advances in microprocessor-based power generation technologies with integrated relay protection functions, the Capstone MicroTurbine generator is designed to be easily interconnected to the electric utility grid, supplementing utility provided electric power.

This Guide is specifically written to assist with the applications of Capstone products. It provides an overview of the interconnection process, based on utility interconnect requirements, pending institutional standards (IEEE 1547, UL 1741), and individual States’ interconnect standards.

480001-001 Rev A (April 2003) Page 1 of 11

This information is proprietary to Capstone Turbine Corporation. Neither this document nor the information contained herein shall be copied, disclosed to others, or used for any purposes other than the specific purpose for which this document was delivered. Capstone reserves the right to change or modify without notice, the design, the equipment ratings, and/or the contents of this document without incurring any obligation either with respect to equipment previously sold or in the process of construction.

Image | Application Guide Interconnection for Capstone MicroTurbines



application-guide-interconnection-capstone-microturbines
Capstone Turbine For Sale - Microturbine C30 C65 C200 C600 C800 C1000 - Go to microturbine website

Search Engine Contact: greg@globalmicroturbine.com