Publication Title | As the saying goes, information is power. The Green Data Center at SU

Microturbine Search Engine Series

Capstone Turbine Publications search was updated real-time via Filemaker on:

Capstone Turbine Publications | Return to Search List

Search Completed | Title | As the saying goes, information is power. The Green Data Center at SU
Original File Name Searched: GDC_facts.pdf | Google It | Yahoo | Bing



Page Number: 001
Previous Page View | Next Page View

Text | As the saying goes, information is power. The Green Data Center at SU | 001



As the saying goes, information is power.

The Green Data Center at SU

That has never been a truer statement than today, when the world depends on the data owing through our electronic lines of communication. But power comes at an increasingly high cost, both in dollars and environmental impact on our planet.

That is why Syracuse University, IBM, and New York State joined together to create the Green Data Center. Through a combination of new innovations and smarter technologies, this partnership has created one of the most energy-ef cient data centers in the world.

As part of its “Smarter Planet” initiative, IBM has worked with SU to look beyond computer hardware and software to the actual infrastructure of the data center. The Green Data Center—with its

own electrical tri-generation system and IBM’s latest computers and computer-cooling technology—is expected to use 50 percent less energy than a typical computer center, making it one of the “greenest” in operation today.

The Green Data Center is a showcase that will demonstrate how energy-ef cient technologies can reduce energy costs and environmental impact. And it is a perfect example of how cross-sector partnerships—the foundation of Scholarship in Action—can truly change the world.

From end to end, the Green Data Center uses new ideas to reduce power loss, increase ef ciency, and reuse waste energy. The project has been registered with the U.S. Green Building Council, the rst step toward LEED (Leadership in Energy and Environmental Design) Green Building Certi cation.

1

Capstone Hybrid UPS Turbines

The data center’s electrical tri-generation system uses 12 patented, natural-gas-fueled microturbines to provide electricity for the Green Data Center. Ten of the microturbines can generate all of the power needed, enabling the data center to operate completely off-grid.

Where a typical data center converts alternating current (AC) power from the utility’s electrical grid to direct current (DC) to power theservers,thesemicroturbinescangenerate any combination of AC and DC power on site, avoiding the loss of power that typically occurs during transmission and conversion.

In addition, the heat generated by the turbines is not wasted. The hot exhaust is piped to the chiller room, where it is used to generate cooling for the servers and heating and cooling for the adjacent of ce building.

Thermax Absorption Chillers

Waste heat from the microturbines is sent to these two absorption chillers, which operate on the principal that water in a vacuum evaporates at very low temperature.

The vacuum is maintained by circulating a lithium bromide solution that absorbs the vapor from the evaporating water. The heat from the 585oF (307oC) turbine exhaust re-concentrates the solution and releases the water vapor, which is thenre-condensedinacoolingtower.Thisunique double-effect process increases the amount of cooling generated. The 45oF (7oC) water is then piped to the Production Data Center to cool the servers.

With no moving parts apart from the water pumps, these chillers are extremely reliable and quiet. Their capacity—equivalent to 300 tons

of ice—produces approximately three times the cooling needed by the data center. The excess chilled water is piped to the adjacent of ce building at 621 Skytop for air conditioning.

3 Cain Heat Exchangers

During the winter, the 585oF (307oC) exhaust from the microturbines ows through these heat exchangers to produce hot

water, capturing valuable energy that would otherwise be wasted. The water is then piped to 621 Skytop to provide free heating for the much larger of ce building.

4 UninterruptiblePowerSupply(UPS) Forty-four tons of sealed batteries provide emergency backup power in the unlikely event that all 12 turbines and the utility grid fail to provide enough electricity to maintain operations. The battery banks generate at least 17 minutes of full data center power, permitting an orderly shutdown of computers in the event of a calamity.

5 Switchgear

Switchgear and other equipment direct electric power supplied to the data center. The equipment routes power:

> From the turbines to the computers.

> From the turbines to the backup

batteries, to keep them fully charged.

> From the batteries to the turbines, to

restart idle turbines.

6 IBMRearDoorHeateXchanger

Cooled water from the absorption chillers is pumped through pipes beneath the oor to special heat exchanger-equipped “cooling doors” on the server racks.

The doors remove heat from each rack far more ef ciently than conventional air conditioning methods. Sensors monitor server temperatures and usage to tailor the amount of cooling delivered, further reducing energy waste and expense.

Adjacent Office Building (621 Skytop)

Chilled Water

Heated Water

Chilled Water

2 Chiller Room 3

Production Data Center

6

2

Turbine Exhaust

AC Power

DC Power

DC Power

Electrical Room

5

Turbine Room

1

Battery Room

4

Natural Gas Main Fuel Source

Propane Backup Fuel Source

Power From Grid

Image | As the saying goes, information is power. The Green Data Center at SU



as-saying-goes-information-is-power-the-green-data-center-at-su
Capstone Turbine For Sale - Microturbine C30 C65 C200 C600 C800 C1000 - Go to microturbine website

Search Engine Contact: greg@globalmicroturbine.com