Global Microturbine - Global Energy LLC


Publication Title | C1000 Series Systems Desiccant Replacement

Microturbine Search Engine Series

Capstone Turbine Publications search was updated real-time via Filemaker on:

Capstone Turbine Publications | Return to Search List

Search Completed | Title | C1000 Series Systems Desiccant Replacement
Original File Name Searched: SB0118_C1000_Desiccant_Change.pdf | Google It | Yahoo | Bing



Page Number: 001
Previous Page View | Next Page View

Text | C1000 Series Systems Desiccant Replacement | 001



Capstone Turbine Corporation • 21211 Nordhoff Street • Chatsworth • CA 91311 • USA Telephone: (818) 734-5300 • Fax: (818) 734-5320 • Web: www.capstoneturbine.com

Service Bulletin SB0118

Date: From: Subject:

September 2013

Capstone Technical Support

C1000 Series Systems Desiccant Replacement

Systems Affected

All C1000 Series (C600/C800/C1000) systems listed in Table 1.

Summary

Capstone has modified desiccant kits for C1000 series systems to better maintain humidity levels within engines and systems in storage.

Original desiccant packages have been modified to eliminate the clay desiccant pack. All desiccant material has been changed to silica gel, and the quantity of silica gel desiccant packs has been doubled from four to eight. The purpose of the change is to better maintain humidity levels within engines and systems in storage.

C1000 series systems in storage or installed and not yet commissioned (less than 12 months from date of shipment) require immediate change to the new desiccant kits. Refer to Table 1 for affected serial numbers.

Required Action

The following action is required to maintain warranty/FPP coverage:

• Install desiccant kit(s) into affected system(s) (refer to Table 1) immediately. Refer to Capstone Model C200 Microturbine and C1000 Series Desiccant Kit Replacement Work Instructions (440297) for specific installation instructions.

Responsibility

It is Capstone’s responsibility to:

• Provide this Service Bulletin containing description of the problem and a recommended solution to Capstone's Authorized Service Providers.

• Make available the desiccant kit (530020-101) at no charge to Authorized Service Providers for the resolution of issues or enhanced functionality related to microturbine systems in storage.

• For system under warranty or FPP:

 If applicable, provide reimbursement for flat rate labor of

o 3hoursforunpacking/repacking(requires2people,1.5hoursperperson) o 0.25hoursperbayfordesiccantreplacement

450126 Rev A (September 2013) Page 1 of 3

This information is proprietary to Capstone Turbine Corporation. Neither this document nor the information contained herein shall be copied, disclosed to others, or used for any purposes other than the specific purpose for which this document was delivered. Capstone reserves the right to change or modify without notice, the design, the product specifications, and/or the contents of this document without incurring any obligation either with respect to equipment previously sold or in the process of construction. Copy is uncontrolled; user is responsible for verifying current revision.

Image | C1000 Series Systems Desiccant Replacement



c1000-series-systems-desiccant-replacement
Capstone Turbine For Sale - Microturbine C30 C65 C200 C600 C800 C1000 - Go to microturbine website

Search Engine Contact: greg@globalmicroturbine.com