Publication Title | City of Penticton Electric Utility Guidelines for Net Metering and Interconnection of Inverter-Based Distributed Resources (DR)

Microturbine Search Engine Series

Capstone Turbine Publications search was updated real-time via Filemaker on:

Capstone Turbine Publications | Return to Search List

Search Completed | Title | City of Penticton Electric Utility Guidelines for Net Metering and Interconnection of Inverter-Based Distributed Resources (DR)
Original File Name Searched: Net_Metering_Guidelines.pdf | Google It | Yahoo | Bing



Page Number: 001
Previous Page View | Next Page View

Text | City of Penticton Electric Utility Guidelines for Net Metering and Interconnection of Inverter-Based Distributed Resources (DR) | 001



City of Penticton Electric Utility

Guidelines for Net Metering and Interconnection of Inverter-Based Distributed Resources (DR)

Table of Contents

1. Introduction .................................................................................................... 1

2. References .................................................................................................... 1

3. Policy .............................................................................................................1

4. General Requirements...................................................................................2

5. Operating Requirements................................................................................3

6. Definitions......................................................................................................4

7. Figures.............................................................................................................

Figure 1: Relationship between Micro-DR System and other interconnection...5 Figure 2: Micro-DR using Solar PV ...................................................................6 Figure 3: Micro-DR using AC Wind Generator ..................................................8 Figure 4: Micro-DR using Micro-Turbine (inverter contained in micro-turbine)..9

1. Introduction

1.1. These guidelines state the minimum requirements for safe and effective parallel operation of the City of Penticton Electric Utility (CPEU) with customer owned inverter-based micro-distributed resource (micro-DR) technologies. The customer should discuss project plans with CPEU staff at the conceptual stage, well in advance of purchasing or installing equipment.

2. References

2.1. CAN/CSA – 22.2 No. 257-06 Interconnection of inverter-based micro- distributed resources to distribution systems

2.2. CAN/CAD – 22.2 No. 107.1-01 General use power supplies 2.3. C22.1 Canadian Electrical Code, Part 1 (most current printing)

3. Policy

3.1. It is the policy of CPEU to permit any customer to operate generating equipment in parallel with its electric system whenever this can be done

1

Image | City of Penticton Electric Utility Guidelines for Net Metering and Interconnection of Inverter-Based Distributed Resources (DR)



city-penticton-electric-utility-guidelines-net-metering-and-interconnection-inverter-based-distributed-resources-dr
Capstone Turbine For Sale - Microturbine C30 C65 C200 C600 C800 C1000 - Go to microturbine website

Search Engine Contact: greg@globalmicroturbine.com