Global Microturbine - Global Energy LLC

Publication Title | Commissioning Checklist - MicroTurbines

Microturbine Search Engine Series

Capstone Turbine Publications search was updated real-time via Filemaker on:

Capstone Turbine Publications | Return to Search List

Search Completed | Title | Commissioning Checklist - MicroTurbines
Original File Name Searched: CommissioningChecklist.pdf | Google It | Yahoo | Bing

Page Number: 001
Previous Page View | Next Page View

Text | Commissioning Checklist - MicroTurbines | 001

Capstone Turbine Corporation · 21211 Nordhoff Street · Chatsworth · CA 91311 · USA Telephone: (818) 734-5300 · Fax: (818) 734-5320 · Web:

Commissioning Checklist - MicroTurbines

Upon completion of commissioning of the MicroTurbine, fill out this form, keep a copy for reference, and return the original to Capstone. A separate form must be completed for each commissioned system if not in a MultiPac configuration.

Only one completed form is required for each MultiPac configuration.

System Serial Number (or MultiPac Serial Numbers):

Date: Owner: Location: City:

Modem Number:


IP Address:



Zip Code: Country:


Site Contact Phone Number: Site Contact Cell Number: Site Contact e-mail Address:



Site Contact Name:

System Part Number:

Site Contact Fax Number:

Site Elevation:

Site Utility Account Representative:

Mechanical Inspection

1. Is there adequate drainage around the MicroTurbine to prevent standing water?

Circle: Y N

2. Model 330 Standard Package - Is the MicroTurbine installed on a surface that allows the cart to be rolled out? Circle: Y N

3. Clearances:

• Model 330 Standard Package - When the cart is rolled out, is there adequate room to access all components, including rolling the cart out far enough to get into the enclosure behind the cart if necessary? Circle: Y N (Recommended clearances in mm/in: Front - 1575/62

Side - 1067/42 Rear - 914/36.)

• Model 330 Industrial Package - Is there adequate clearance to remove the panels to access all

components, including access to the front and the rear of the system? (Recommended clearances in mm/in: Front - 914/36 Side - 1067/42

512903-001rA (Jan 2002) 1 of 13

Circle: Y N Rear - 914/36.)

Commissioning Checklist

This information is proprietary to Capstone Turbine Corporation. Neither this document nor the information contained herein shall be copied, disclosed to others, or used for any purposes other than the specific purpose for which this document was delivered. Capstone reserves the right to change or modify without notice, the design, the equipment specifications, and/or the contents of this document without incurring any obligation either with respect to equipment previously sold or in the process of construction.

Image | Commissioning Checklist - MicroTurbines

Capstone Turbine For Sale - Microturbine C30 C65 C200 C600 C800 C1000 - Go to microturbine website

Search Engine Contact: