Global Microturbine - Global Energy LLC


Publication Title | Kerosene Filtration Requirement for Capstone Model 330 MicroTurbine

Microturbine Search Engine Series

Capstone Turbine Publications search was updated real-time via Filemaker on:

Capstone Turbine Publications | Return to Search List

Search Completed | Title | Kerosene Filtration Requirement for Capstone Model 330 MicroTurbine
Original File Name Searched: SB0028_Kerosene_Filtration_Requirement_C30.pdf | Google It | Yahoo | Bing



Page Number: 001
Previous Page View | Next Page View

Text | Kerosene Filtration Requirement for Capstone Model 330 MicroTurbine | 001



Capstone

Service Bulletin

Date: From: Subject:

October 2001

Capstone Customer Service

Kerosene Filtration Requirement

for Capstone Model 330 MicroTurbine

Capstone Customer Service Toll Free Phone: (877) 282-8966 E-mail: service@capstoneturbine.com Phone: (818) 734-5325 • Fax: (818) 734-1070

Be sure to read these instructions when using kerosene fuel with the Capstone Model 330 MicroTurbine.

Introduction

This document provides information on kerosene filtration, and instructions for adding the Capstone’s external liquid fuel filter kit with the Model 330 MicroTurbine.

Affected

Capstone Model 330 MicroTurbine installations using kerosene as the liquid fuel.

Summary

If an appropriate inlet fuel filter is not used with kerosene fuel, then it is possible that the fuel pump on the MicroTurbine will fail in a relatively short time and void the product warranty.

Capstone requires the addition of an external two-micron or finer filter with 98% or higher efficiency, to eliminate premature failure of the fuel pump, in the fuel system within the MicroTurbine package. The filter may be provided by the user or it may be purchased from Capstone.

513113-001 (Oct 2001) Page 1 of 6 Service Bulletin SB0028

Rev A

Capstone Turbine Corporation reserves the right to change or modify without notice the design, the equipment specifications, and/or the contents of this document without incurring any obligation either with respect to equipment previously sold or in the process of construction.

Image | Kerosene Filtration Requirement for Capstone Model 330 MicroTurbine



kerosene-filtration-requirement-capstone-model-330-microturbine
Capstone Turbine For Sale - Microturbine C30 C65 C200 C600 C800 C1000 - Go to microturbine website

Search Engine Contact: greg@globalmicroturbine.com