Global Microturbine - Global Energy LLC


Publication Title | Model C6x v4.50 Rev. K Software Release

Microturbine Search Engine Series

Capstone Turbine Publications search was updated real-time via Filemaker on:

Capstone Turbine Publications | Return to Search List

Search Completed | Title | Model C6x v4.50 Rev. K Software Release
Original File Name Searched: SB0081_C6x_v450_Software_Release.pdf | Google It | Yahoo | Bing



Page Number: 001
Previous Page View | Next Page View

Text | Model C6x v4.50 Rev. K Software Release | 001



Capstone

Capstone Turbine Corporation • 21211 Nordhoff Street • Chatsworth • CA 91311 • USA Telephone: (818) 734-5300 • Facsimile: (818) 734-5320 • Website: www.microturbine.com

Service Bulletin SB0081

Date: From: Subject:

Affected

February 2007

Capstone Technical Support

Model C6x v4.50 Rev. K Software Release

All Capstone Model C6x MicroTurbine systems

NOTE

System Software v4.50 is not compatible with MicroTurbines operating with a Capstone Power Server (CPS100)

NOTE

Implemented new fault code 7016: Grid Synchronization Fault

NOTE

Implemented new fault code 5025: Fuel Leak Fault

NOTE

Does not affect any inverter or protective relay functionality

Summary

1. Incorporated software compatibility for the Woodward Valve Controller (UFCB) with existing engine components.

2. Added generator power on the first line of the display panel menu selection. The second line adds “OK” or FLT status before the turbine number. If no fault is present, “OK” will appear. If any fault with severity level greater than “1” is present, “FLT” will display:

System Data 1/13

GC Single OK(/FLT) 1 xx.x kW Gen

xx.x kW Out

3. Incorporated Dual Mode Fast Transfer capability, which enables the system to fast transfer from Grid Connect (GC) to Stand Alone (SA) without shutting down utilizing a Capstone Dual Mode Controller (see Capstone Fast Transfer Application Guide 480011 for additional details).

a. Transfer from GC to SA operation is conducted automatically after the detection of the loss of the grid.

b. Transfer from SA to GC operation depends on the following system settings:

c. When the system is running in SA Load state, recovery of the grid will make the system transfer to SA recharge state after a one minute forced SA load operation.

450068 Rev A (February, 2007) Page 1 of 3

This information is proprietary to Capstone Turbine Corporation. Neither this document nor the information contained herein shall be copied, disclosed to others, or used for any purposes other than the specific purpose for which this document was delivered. Capstone reserves the right to change or modify without notice, the design, the product specifications, and/or the contents of this document without incurring any obligation either with respect to equipment previously sold or in the process of construction.

Image | Model C6x v4.50 Rev. K Software Release



model-c6x-v450-rev-k-software-release
Capstone Turbine For Sale - Microturbine C30 C65 C200 C600 C800 C1000 - Go to microturbine website

Search Engine Contact: greg@globalmicroturbine.com