Text | UNIGIN Service Bulletin 5 heat recovery unit users | 001



1030 Clarke Side Road • Box 5395 • Station B • London, ON Canada N6A 4P4 unifin@kochind.com

SERVICE BULLETIN 5 (Revision 2) DATE: March 20, 2002 R0 (Rev.2 June 6/03)

TO: micoGenTM Heat Recovery Unit Users

Contact: Carmine Fontana, Customer Service Manager

RE: External Ducting Seals

From: L. Brescacin,

Thermal Engineering & QA Manager

PHONE: (519) 451-0310 Ext 143

EMAIL: FontanaC@kochind.com FAX: (519) 451-0310

The interconnecting ducting between the turbine(s) and the micoGenTM unit and between the micoGenTM outlet duct and the exhaust duct to atmosphere must be secured with a suitable clamp whether the ducting is purchased from Unifin or from others. Before installing the clamp, insert high temperature sealant rated for continuous operation of turbine gas at 750 °F (minimum). If the clamp and sealant are not installed, the gas from the turbine may leak into the micoGenTM unit and result in over heating. This will invalidate the warranty.

UNIFIN offers external ducting packages for interconnection between the micoGenTM unit and the turbine(s) these packages include clamps for securing the connection.

Recommended Suitable Clamps:

Generation 1 – 5” Ducting (30kW, 60kW & 75kW)

1) At turbine Connection use Clamp – Accuseal # 69-500 5” – Unifin Part M1400014 (Gen 1)

2) At micoGenTM and other connections use Clamp Wide Band Torctite #67-500 5” - Unifin Part

M1400045

Generation 1 – 8” Ducting (120kW)

1) At micoGenTM use Clamp 8” Seal Master # 68-800 – Unifin Part M1400047

Generation 2 – 5” Ducting (30kW, 60kW & 75kW)

1) At turbine Connection use Clamp – Accuseal # 69-500 5” – Unifin Part M19012-20P4

2) At micoGenTM and other connections use Clamp Wide Band Torctite #67-500 5” - Unifin Part

M19012-20P5

Generation 2 – 8” Ducting (120kW)

1) At all connections use Clamp – 8” SealMaster # 66-800 – Unifin Part M49011-20P6

Recommended Sealant: For both Generation 1 & 2

Extreme Temperature Gasket Maker - Mica-based paste – Temperature rated 2350 F Unifin Part M00037P-20

Reference Kit: MG-KIT-SB5

Image | UNIGIN Service Bulletin 5 heat recovery unit users



unigin-service-bulletin-5-heat-recovery-unit-users